SunWorks role · Full-scope EPC under an OPEX model
NRKR Textiles
4.2 MWp · Textiles · Guntur, Andhra Pradesh
Project overview
About the project
A ground-mounted plant supplying NRKR Textiles’ continuous operations in Guntur, delivered with no upfront investment by the client.
Scope delivered by SunWorks
Full-scope EPC under an OPEX model
Engineering, procurement and construction delivered by SunWorks (Full-scope EPC under an OPEX model).
- Capacity
- 4.2 MWp
- SunWorks role
- Full-scope EPC under an OPEX model
- Installation
- Ground-mount
- Industry
- Textiles
- Location
- Guntur, Andhra Pradesh
- Project date
- August 2022
- Reported generation
- 12,440,000 kWh to date
- Reported savings
- ₹9.95 crore over 2.5 years
Start a project
Planning a similar project?
Tell us where your project stands and what support you need. We will route your enquiry to the right engineering or project lead.

